Pilot House Construction
Queen's Village | Philadelphia, PA

BEFORE
195287874_1210041249450652_4695342423785633938_n.jpg
After
244942568_265899398753486_608535319333495607_n.jpg
271440803_992001044859026_2359306669694712547_n.jpg
FULL INTERIOR GALLERY:

Click individual images to see larger detail

ABOUT THE PROJECT:
FULL EXTERIOR GALLERY:

Click individual images to see larger detail

*Some aspects of this project are still under construction due to backordered materials

Company Affiliation: Walnut Tree Construction

Date of Completion: December 2021 (Interior only; Exterior still under construction) 

Scope of Work: 

● Demolition of existing ceiling to reveal existing framing

● Temporary wall construction

● Modification of existing roof joist layout to engineer specifications- moving existing steel joist and addition of new structural steel joists 

● Framing of pilot house structure from rooftop

● Weather sealing of new structure (Tyvek system)

● Framing layout for new custom stairwell; including construction of two split landings

● Installation of three casement windows (two singles; one double)

● Installation of 96" exterior glass door

Spray foam insulation in newly constructed wall and ceiling bays

● Installation of custom staircase (three runs connected by landings)

● Installation of red oak flooring on stairwell landings

● Installation of all necessary casing, baseboard, and shoe molding

Role: Assistant Carpenter (total team of two)